Difference between revisions of "LMU SKWH 2021"

From Sketching with Hardware at LMU Wiki
Jump to navigation Jump to search
Line 46: Line 46:
 
'''20.05.''' Tasks 2
 
'''20.05.''' Tasks 2
  
'''3.06.''' Tasks 3; Group project Ideation
+
'''10.06.''' Tasks 3; Group project Ideation
  
 
'''17.06.''' Group project presentation incl. idea of hardware needs
 
'''17.06.''' Group project presentation incl. idea of hardware needs

Revision as of 09:20, 1 June 2021

Welcome to Sketching With Hardware Summer Term 2021!

Kickoff (April 15): Task 0

Please watch Introduction to sketching with hardware on YouTube (16 min): https://youtu.be/Irxo9b5cexs

[Optional] please read “Understanding and researching through making: a plea for functional prototypes” [1], 4 pages magazine paper

[Optional] please watch a longer talk on sketching with hardware (58 min) https://www.ubicomp.net/talks/skhw2021/sketching-ssp05_player.html

Make and bring a paper prototype of head worn device, that provides feedback to the environment about availability of the person, similar to the necklace described in [2].

References

[1] Albrecht Schmidt. 2017. Understanding and researching through making: a plea for functional prototypes. interactions 24, 3 (May + June 2017), 78–81. DOI: https://doi.org/10.1145/3058498 PDF: https://www.sketching-with-hardware.org/files/functional3058498.pdf

[2] Jonna Häkkilä, Romina Poguntke, Emmi Harjuniemi, Lauri Hakala, Ashley Colley, and Albrecht Schmidt. 2020. BuSiNec - Studying the Effects of a Busyness Signifying Necklace in the Wild. In Proceedings of the 2020 ACM Designing Interactive Systems Conference (DIS '20). Association for Computing Machinery, New York, NY, USA, 2177–2188. DOI:https://doi.org/10.1145/3357236.3395455 PDF: https://lacris.ulapland.fi/ws/portalfiles/portal/6805172/3357236.3395455.pdf

Session 1: Introduction (May 6)

  • Discussion of Task 0
  • Introduction to the course book
  • Hardware handout/delivery organization

Tasks

  • Complete Tasks 1, 3, and 6
  • Submission deadline: May 19 (Uni2Work)

Session 2 (May 20)

  • Hardware Kit: Did everyone get one?
  • Review Task 1

Tasks

  • Complete Tasks 9, 10, 12, 13, 14
  • Submission deadline: June 2 (Uni2Work)

Dates

Meetings start at 6pm and last around one hour.

15.04. Kickoff: Dates, Format, Hardware delivery organization, Task: read paper and prepare paper prototype

6.05. Hardware presentation, forming teams, Tasks 1

20.05. Tasks 2

10.06. Tasks 3; Group project Ideation

17.06. Group project presentation incl. idea of hardware needs

24.06. Hardware list submission

Additional dates will follow after June 24 for the group projects.